EXPOSED CONCRETE PRIMER

TECHNICAL SPECIFICATIONS

  • Full hardening time: 24 hours

  • Contact time:  4-6 hours

  • Second coat application time: 6-8 hours

  • Density: 1,03 kg/lt

SURFACE PREPARATION

  • The surface to be applied should be free of anti-sticking agents and firm.
    Flaws on the application surface should be corrected and gauged with Izodress repair mortar.

USAGE AND APPLICATION

  • Exposed concrete primer should be poured into 12 liter bucket adding 4-6 liters of water and preferably mixed with a low-speed mixer (lower than 500 rpm) until a homogeneous mixture is obtained and then applied with a brush or a roller.

  • During the application, the admixture in the container should be mixed at certain intervals.

  • Dryingtime is 45 to 60 minutes.

  • Plaster application can be performed 24 hours later from the product application.

  • The temperature of the application surface should be minimum 5Cº to 30Cº and should not receive any rain.